F Series Mud Pump
Main Feature
F series mud pump has a longer stroke and can be operated at a lower stroke, thus improved the water supplying perfor-mance effectively and extended the lifetime of expendable parts in the fluid end greatly.
The power end uses combined lubricating system of forced lubrication and splash lubrication. Reliable to lubricate and promote the service life of power end.
This series mud pump are strictly manufactured according to API Spec 7k “the Equipment Specification of Well Drilling and Repairing”, and are tested accordingly when leave factory.
Parameter
| Model | F-500 | F-800 | F-1000 | F-1300 | F-1600 |
| Type | Triplex single acting | Triplex single acting | Triplex single acting | Triplex single acting | Triplex single acting |
| Rated Power | 373kw 500HP | 596kw 800HP | 735kw 1000HP | 969kw 1300HP | 1193kw 1600HP |
| Rated Speed | 165 SPM | 150 SPM | 140 SPM | 120 SPM | 120 SPM |
| Stroke(mm/inch) | 190/7 1/2″ | 228.6/9″ | 254/10″ | 305/12″ | 305/12″ |
| Max.Liner Dia. | 170/6 3/4″ | 170/6 3/4″ | 170/6 3/4″ | 180/7″ | 180/7″ |
| Gear Type | Herringbone | Herringbone | Herringbone | Herringbone | Herringbone |
| Valve Pot | API-5 | API-6 | API-6 | API-7 | API-7 |
| Gear Ratio | 4.286:1 | 4.185:1 | 4.207:1 | 4.206:1 | 4.206:1 |
| Suction Inlet | 203/8″ | 254/10″ | 305/12″ | 305/12″ | 305/12″ |
| Discharge Inlet | 4″Flange 5000 psi | 5″Flange 5000 psi | 5″Flange 5000 psi | 5″Flange 5000 psi | 5″Flange 5000 psi |
| Lubrication | Forced& Splash | Forced& Splash | Forced& Splash | Forced& Splash | Forced& Splash |
| Max. Pressure | 27.2Mpa 3945 psi | 34.5Mpa 5000 psi | 34.5Mpa 5000 psi | 34.5Mpa 5000 psi | 35Mpa 5080 psi |
| Overall Size(in) | 144*106*86 | 156*79*66 | 163*89*70 | 174*121*78 | 181*129*106 |
| Weight(kg) | 9770 | 14500 | 18790 | 24572 | 24791 |
We also can offer the spare parts of the mud pump.
Q1: what are seger's current lead times? A1: Our lead times are dependent upon casting and finishing requirements,but generally are as follow: 30 days after receipt the down payment usually. urgent need, please discuss with us to find a way out! Customer Service




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
25 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.