Specification of 9 5/8" Hinged Semi-Rigid Centralizer/solid body centralizer
scription
Casing centralizer can be applied directly to casing to form stabilizers for cementing with casing or liner in both straight and directional wells, Usually bow centralizer is used for straight oilwells, rigid centralizer is used for directional oilwell Slip on Welded Single Piece Bow Spring centralizer.
Almost 13 years experience of designing, manufacturing and continual improvement of our non-weld centralizers for casing cementing, we provides non-welded bow spring centralizers, which are designed and manufactured as per API spec.
The popular styles available are non-welded single bow spring centralizer, and double –bow spring centralizer,slip on welded centralizer, rigid centralizer, straight bow centralizer, Slip on Welded Single Piece Bow Spring centralizer with high reliable quality.
2. Featrues
1,Our newest design has features making them ideal for both tubing and casing applications
2,The non-weld design eliminates any weak spots.
3,Tapered pin hold the bows and hinges in the collars
4,High-quality, super-strengthen spring-steel bows and especialy designed collar hinges provide reliable downhole performance.
5,The whole casing centralizer is made without any rivet and no welding.
6,The whole casing centralizer is composed of 3 parts, the spring, the hinges and tapered pin.
7,Easy for installation and transport
8,Conform to API standard
9 5/8" Hinged Semi-Rigid Centralizer/solid body centralizer
3,Technical Parameter
| Specification | In-Dia(mm) | Wall Thickness (mm) | Height(mm) | Total height(mm) | Largest Dia(mm) | Spring Number |
| 5-1/2”*8-1/2” | 142-148 | 3-5 | 55 | 650 | 225 | 5 |
| 7”*9-5/8” | 181-186 | 3-5 | 55 | 650 | 255 | 6 |
| 7”*8-1/2” | 181-186 | 3-5 | 55 | 650 | 235 | 6 |
| 8-5/8”*12-1/4” | 223-228 | 3-5 | 55 | 650 | 330 | 8 |
| 9-5/8”*12-1/4” | 250-255 | 3-5 | 55 | 650 | 330 | 8 |
| 10-3/4”*12-1/4” | 274-276 | 3-5 | 55 | 650 | 330 | 9 |
| 13-3/8”*17-1/2” | 342-347 | 3-5 | 55 | 650 | 450 | 11 |
| 18-5/8”*24 | 476 | 3-5 | 55 | 600 | 610 | 12 |
| 20”*26 | 510 | 3-5 | 55 | 600 | 660 | 12 |




-
Step 1
Payment and order readiness
Minimum order: 10 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.