| Model No. | LSCO-4 |
| Power | AC220V 1φ 50HZ 6KVA |
| Inner Size | W800mm×D600mm×H1000mm |
| Outer Size | W1100mm×D1060mm×H1680mm(For Reference) |
| Inner Material | SUS430# Stainless steel sheet |
| Outer Material | SS41# cold-rolled sheet, baking after anti-static treatment |
| Seal | High temperature resistance silicon sealing strip |
| Temp. Range | RT~ 250 ℃ |
| Heating Rising Time | about 40 mins from RT to 250 ℃ ( empty testing) |
| Temp. Uniformity | ±1.5% ℃ |
| Temp. control Accuracy | ±1℃ |
| Timing Range | 9999Timer,digital display and setting |
| Air Supply | Force Hot Air Supply, Horizontal air supply system, special wind pathway design |
| Controller | "CAHO-P961" Multi-step temperature Controller,PID automatic calculation, SSR output, LED display, digital setting, "XZ-480" overheat Protection Device, Temperature sensor |
| Safety Device | All the components do meet international safety standards. |
| Remark | All above information can be customized as per the clients' demand. |
To date, we have been exporting product to a wide range of countries and regions, like the,,,,,,,, etc. We have established a long-term business cooperation with Gree, Midea, HuaWei, Panasonic,Toyota, Pioneer, OMRON, Molex, Delco, Antolin, and many other well-known brand.
Dongguan Xinzhou and both also have passed the ISO9001 quality and managerment certification. And Dongguan Xinzhou has more than 10+ patents, the same to.
In 2021, has got the "High & New Technogical Enterprise" certificate.
The products are packed well before shippment.
All the machines are packed as below
| Q |
| A: We are both manufacture and trading company. We have over 15 years' professional experience as an industrial drying equipment manufacturer. |
| Q: Do you provide OEM ODM service? |
| A: Yes. We have our own R&D team to customize your machine plan. |
| Q: How about the production capacity of your company? |
| A |
| Q: How could we trust you and your company for the first transaction? |
| A |
| Q: How long is your warranty? |
| A: One year after the arrival of the goods. |
| Q: What about your delivery time? |
| A: Normally within 25 working days against down payment. |
| Q: What about the package of your export product? |
| A: We use standard export wooden case with foam inside. |
| Q: Can we visit the factory? |
| A: Yes, welcome. We have two factories, one is in Dongguan, Guangdong Province; The other is in Xiangyang, Hubei Province. |




-
Step 1
Payment and order readiness
Minimum order: 3 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.