Product details
This
The high-efficiency low-resistance five-stage cyclone pre-heater and cdc furnace system with high gas adaptability, high classification efficiency, high heat exchanging efficiency and low system resistance will be adopted at the kiln inlet, so as to increase the output of clinker.
New technology will be adopted at the rotary kiln head.
In the raw meal grinding section, air swept drying mill is adopted. The raw material is dried by waste heat from the kiln inlet to save energy and investment.
According to technology requirements of the new dry process rotary kiln, advanced computerized dcs control system is adopted for the control of main production parts from bottom of raw material blending silos to top of cement silos. And PLC control system is adopted for other parts.
Great importance has been attached to the environment protection in the plan. In order to measure up to the environment protection standard, advanced and practicable dust collectors are adopted at all dust generating points.



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
60 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.