South Korea
·
reply: Thanks for your recognize my dearest customer, wish we can be lifetime cooperator and partner.
| SPECIFICATIONS FOR USED ENGING OIL RECYCLING MACHINE | |
| Capacity | 5TPD, 10TPD, 20TPD, 30TPD...300TPD |
| Working Type | Continuous Working, Semi-Continuous Working |
| Automatic Degree | Fully Automatic, Semi-Automatic |
| Applicable Material | Crude Oil, Used Engine Oil, Waste Hydraulic Oil, Plastic Oil, Tyre Oil, Mixed Waste Oil, Other waste oil as customer required |
| Heating Fuel | Fuel Oil, Natural Gas, Electric, Coal, Firewood |
| Main Parts Material | Q345R Steel Plate, Alloy Steel Plate, Stainless Steel |
| Machine Covering Area | Varies by Design and Capacity |
| Technology Adopted | Catalytic Pyrolysis Distillation, Refined Filtration, Self-made Gaseous and Liquid Catalyst, etc. |
| No. | End Production | Yield | Usage |
| 1 | Diesel | 73% | Used for diesel engine |
| 2 | Gasoline | 12% | Used for gasoline engine |
| 3 | Residue Oil | 9% | * Feeding into Pyrolysis Machine for second Pyrolysis * Sold directly for building road |
| 4 | Non-Condensible Gas | 3% | Recycle as Heating fuel after treated by Gas-treatment System |
| 5 | Other | 3% | * Water and impurity 2% * Loss 1% |
| Company Name | |
| Covering Area | 28000 ㎡ |
| Founded Year | 2008 |
| Certification | CE, SGS, 8 National Invention Patents and Utility Model Patents |
| Main Production | Used Engine Oil/Pyrolysis Oil/Crude Oil, other Waste Oil Distillation Machine Waste Tyre/Plastic/Acrylic/Oil Sludge, etc. Pyrolysis Machine |
| Engineer Service | 4 R&D Engineers, 19 Technicians |
| International Market | 15% Europe, 14% Southeast Asia, 33% Chinese Mainland, 5% America, 7% Africa, 8% Middle East, 3% East Asia, 11% South Asia, 4% Central Asia |
| 1 | 10 Years Manufacturing Experience |
| 2 | Constant Updating in each detailed Parts |
| 3 | Lifetime Responsible for Machine Running and Maintenance |
| Trustworthy Service · Installation Quality and After-Sale Service | |
| 1 | Free Installation, Training and Debugging |
| 2 | 2 Years Warranty for Whole Set Machine |
| 3 | Reactor Lifetime warranty to be more than 5 years |
| 4 | Discharging Time Require only 1 hour, fully sealed to ensure environmental process |
| 5 | Running machine can be visited before confirming cooperation |
* Free visiting machine running site; * Free Testing sample; * Free Design and Technical Service
* Free engineer send to customer for installation and Debugging; * Free Training for Operators
* 2 Years warranty for whole set machine * Lifetime Maintenance




Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
35 days
Air + Express via FLY Logistics · Approx. shipping fee: $ 4.00 for 1 set · Transit time: Est. 8-9 days
Final packing, freight, and delivery dates are confirmed before dispatch.
South Korea
·
reply: Thanks for your recognize my dearest customer, wish we can be lifetime cooperator and partner.
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.