Skip to Content

Browse

500 TPD Mining Copper Refining Processing Machine Copper Ore Beneficiation Plant

Available for enquiry 0.0 · 0 reviews
USD

29,920.00 29920.0 USD 29,920.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
Mineral Ore Processing Plant
Voltage
Based on the models
Core components
Bearing, PLC, Motor, Pressure Vessel, Gear, Engine, Pump, Gearbox, Other
Machinery test report
Provided
Warranty
1 Year
Video outgoing-inspection
Provided
Product description

500 TPD Mining Copper Refining Processing Machine Copper Ore Beneficiation Plant

Product Introduction

Are you encountering the following problems with your mine development project?

Exceeds the investment budget: Failed to meet the production target on schedule; Need technological transformation since put into production.

Heavy Industry has more than thirty years of practical experience and establishes a scientific and efficient assessment system so that each project can be completed according to standardization, process and intelligence. Guarantee high project standards and production on schedule with optimal ROI.

How to build an effective mineral ore processing plant?

1.The first step is to conduct a mineral test It is recommended to conduct a mineral ore test before the separation and production. At the same time, customers can customize the most effective and scientific beneficiation process and equipment based on the ore properties and investment budget to avoid waste of resources.

2. Crushing and grinding

3. Beneficiation

We can help you analyze mineral ores, provide various mineral processing production lines. Extract metals through reasonable and efficient processes and improve ore grade, we can meet all your needs for mineral processing equipment.

Customer Site

1500t/d copper-lead-zinc mine project

Ore type: polymetallic Processing scale: >1000TPD Process flow: two-stage and one closed-circuit crushing - one-stage self-grinding, lead coarse concentrate regrinding - priority flotation - two-stage dehydration process

200t/d gold ore beneficiation project

Ore type: gold Processing scale: <300TPD Process flow: ore washing - crushing - grinding and classification - cyanide leaching process flow.

1,100t/d Copper-Lead Mineral Processing Plant

The grade of copper in the raw ore is 1.26%, and the oxidation rate of copper was 65.87%. Gold, lead, zinc, silver, sulfur, iron, and other elements were of low grade and have no recycling value. had designed two roughing, two scavengings, and three concentration flotation processes. After two roughing, two scavengings, and three concentration flotation processes, 90% of raw ore with a grinding particle size of -200 mesh and can be selected as a concentrate with a yield of 4.70%, a copper grade of 19.12%, and a copper recovery rate of 71.28%.

What We Can Offer

Lithium Ore Spodumene Processing Plant

To improve the lithium ore grade, a beneficiation process is required. The particle size of lithium ore generally needs to be ground to less than 0.15 mm for a better flotation effect. Flotation is the main method for producing lithium concentrate. Other methods like magnetic separation and chemical methods play an auxiliary role.

Gold CIL Plant · Gold CIL process (carbon in leach) is an efficient method of extracting and recovering gold from its ore. By cyaniding and carbon leaching crushed gold ore slurry simultaneously, CIL process lowers the gold mining operation cost and increases gold recovery rate to a degree of 99%. Compared with the traditional CCD process, it saves 66% of investment is the first choice of modern gold mining and gold beneficiation plant.

Note: Taking a mining company with a monthly processing capacity of 100,000 tons of 7.5g/t as an example, the CIL carbon leaching method saves investment costs of US$486,000 compared to the CIP carbon slurry method and reduces the backlog of gold retained in production by US$201,700. The additional cost of activated carbon of US$12,600 in the process resulted in savings and early recovery of US$675,100.

Gold CIP Plant

Gold CIP process adsorbs gold from cyaniding pulp by active carbon including 7 steps: leaching pulp preparation, cyaniding leaching, carbon adsorption, gold loaded carbon desorption, pregnant solution electrodeposit, carbon acid regeneration, and leaching pulp. There are two kinds of ore suitable for the gold CIP system: one is flotation gold concentrate, amalgamation, and gravity tailings; the other is mudded oxidized ore.

Gold Heap Leaching Plant

Heap leaching (HL) is a flexible and economic mineral processing method, commonly used to extract gold from low-grade gold ores. Heap leaching method is always used for low-grade ore, small gold mine, or both.

Gold F lotation Plant

Flotation is widely used in gold processing.80% of rock gold is processed by flotation. The flotation process maximizes the enrichment of gold into sulfide minerals. The tailings can be directly discharged. Flotation in gold mines has low beneficiation costs.

Cu-Pb-Zn Production Plant · Adopting mixed flotation-concentrate regrinding process can reduce the grinding cost, and be easy to manage. Application of new non-toxic flotation reagents is efficient and environmental protection. Mixed flotation-concentrate regrinding process is applied for Cu-Pb-Zn sulfide ore.

Other Metal Ore Beneficiation Plant · Starting from every link, we will build a green and efficient mineral processing

Different requirements will have different configurations, if you also have such requirements

* Most of our products are CE, ISO and GOST certified * All of our products are made with care and covered for 1 year warranty! * Free installation and operator training

We are professional engineers Experienced mining and mineral processing engineers make sure the technology right.

We are trusted team Members Professional installation and management team of skilled workers, guarantee the successful plant operation.

We are expert designer Engineering experts optimize the solution and engineering design for project perfectly building up.

Since the foundation in 1987, has attained 124 patents on crushers & mills over the past 30 years. Holds a number of patents, has established overseas offices in Europe, Africa, Asia, South America and other countries, and export our products to more than 90 countries.

As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any size-reduction requirements including quarry, aggregate, and different kinds of minerals. We can provide you the complete stone crushing grinding and beneficiation plant.

The company's business scope covers all over the world. So far, it has completed thousands of mining and quarry full industry chain service projects, and has the technology and experience in crushing, grinding, mining and dressing of more than 70 kinds of ores.

Shipping

1."Small parts are wooden box package" 2."The major machine nude packing, container, or upon customers' requirement" 3."Export Standard" 4. Delivery Time: 30 days for batch goods.

Payment Terms 1. Payment: T/T, L/C 2. MOQ: 1set 3. Warranty: 1 years

FAQ

Q: How is the quality of your machine?

A: Our products are manufactured strictly according to national and international standard, and we take a test on every machine before delivery. Q: How about price? A: We are factory and be able to give you the reasonable price than market one, and we have a policy that “ for saving time and absolutely honest business attitude,we quote as low as possible for any customer, and discount can be given according to quantity”. Q: What about Warranty? What will we do if the machine is broken down? A: The warranty period for all of ’s structural and mechanical equipment is one year. Q: What could you help me to do for the business? A: We can provide you with proposal chart for complete production lines, spot inspection and operator training according to your demands and the conditions of applied spot, we can help you choose the right equipment,drilling rig,loader,trucks,excavators and so on. Q: Payment Terms and Service? A. We usually accept T/T, L/C; B. Our engineer is aviliable to installation machine overseas; C. The guarantee period of our machine is one year; D. Spare parts will supply at any time. Q: What should i need to do for if i want to get a best and fast quotation? A: Hi, if you want us recommend a suitable type for you; please let us know as follows: 1).the capacity (tons per hour) 2).output size 3).material type

A: Our products are manufactured strictly according to national and international standard, and we take a test on every machine before delivery.

Q: How about price?

A: We are factory and be able to give you the reasonable price than market one, and we have a policy that “ for saving time and absolutely honest business attitude,we quote as low as possible for any customer, and discount can be given according to quantity”.

Q: What about Warranty? What will we do if the machine is broken down?

A: The warranty period for all of ’s structural and mechanical equipment is one year.

Q: What could you help me to do for the business?

A: We can provide you with proposal chart for complete production lines, spot inspection and operator training according to your demands and the conditions of applied spot, we can help you choose the right equipment,drilling rig,loader,trucks,excavators and so on.

Q: Payment Terms and Service?

Q: What should i need to do for if i want to get a best and fast quotation?

A: Hi, if you want us recommend a suitable type for you; please let us know as follows

Description images
500 TPD Mining Copper Refining Processing Machine Copper Ore Beneficiation Plant
500 TPD Mining Copper Refining Processing Machine Copper Ore Beneficiation Plant
500 TPD Mining Copper Refining Processing Machine Copper Ore Beneficiation Plant
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    30 days

  • Step 3

    Packaging and dispatch

    Economy · Approx. shipping fee: $ 71.77 for 1 set · Estimated delivery: Oct 5–Nov 13 (30–69 days)

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 24 fields
Type
Mineral Ore Processing Plant
Voltage
Based on the models
Core components
Bearing, PLC, Motor, Pressure Vessel, Gear, Engine, Pump, Gearbox, Other
Machinery test report
Provided
Warranty
1 Year
Video outgoing-inspection
Provided
Key selling points
High Quality
Production Capacity
20-500 TPD
Place of origin
China, Henan
Weight
3100 KG(6834.33lb)
Application
Ore Processing Plant
Processed Materials
etc., Copper Ore, Gold ore, Iron ore, lithium ore
Recovery rate
95-99%
Color
Customers' Requirements
Certificate
CE/ISO
Price
Negotiable
Installation
Technical Guidance
Factory Visit
Welcomed Warmly
After-sales Service Provided
Field maintenance
Selling Units
Single item
Single package size
50X50X40 cm
Single gross weight
50.000 kg
Model number
Full set processing plant 20-500 t/h
Power (W) (Product option)
According to the model
Lead time
30 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.