Plastic Coated Steel Pipe is a steel pipe treated with a protective coating to enhance its durability and resistance to corrosion. These coatings, which can be applied to both the interior and exterior surfaces, serve multiple purposes such as preventing rust, extending the pipe’s lifespan, improving the flow of fluids or gases, and providing thermal insulation. Common coating materials include epoxy, polyethylene, polyurethane, and fusion bonded epoxy, each offering specific benefits like chemical resistance and abrasion protection. Coated steel pipes are essential in industries like oil and gas, water supply, sewage, and construction, where they provide reliable performance under various environmental and mechanical stresses.
Foog grade materials
| item | value |
| Invoicing | By Actual Weight |
| Oiled or Non-oiled | Non-oiled |
| Section Shape | Oval |
| Surface Treatment | Hot-dip plastic coating |
| Tolerance | ±1% |
| Place of Origin | |
| Shandong | |
| Alloy Or Not | Non-Alloy |
| Delivery Time | 8 ~ 14 days |
| Grade | Q235,Q355,20,7235,API 5L Gr.B,X42,X52,X60,ASTM A53 |
| Standard | ASTM |
| Model Number | HL |
| Brand Name | HL-00001 |
| Application | FirefightingPipinc |
| Certificate | API, ISO 9001, CE |
| Outer Diameter | |
| Processing Service | Welding, Punching, Cutting, Bending, Decoiling |
| Special Pipe | FirefightingPipinc |
| Product name | Fire fighting pipeline |
| Surface | Consumer's Requirement |
| Coating Materials | Heat-resistant polyethylene (PE-RT),Polytetrafluoroethylene (PTFE) |
| Coating Methods | Hot-dip plastic coating,Preheating,External spraying,Maintenance / Conditioning |
| Connection Methods | Grooved connection,Flanged connection,Socket connection,Threaded connection |
| Standards & Specifications | Rules for the inspection of coating plastic steel pipe for import and export |
| Performance & Features | Heat resistance,Chemical stability |
| Coating Inspection | Holiday detection / Spark testing |
| Applications | Fire fighting pipeline |




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
31 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.