Factory Directly Gold Electrolytic Refining Machine Mining Machinery For Gold Ore Leaching Agent
R ec overing principle: The use of the principle of electrolytic adsorption to restore liquid metal ions to metal, and metal adsorbed on the cathode, peeling off the metal residue, re-refining and use.
Application
The machine can used to recovery metal from plating solution,drag-out tank, strip solution, plating rinsewaters and Iodine and iodide etching solution and it also can recovery silver in the fixer solution.
1. it can used to recovery gold, silver, rhodium, platinum and palladium in the plating solution.
2. It can used to recovery gold, silver, rhodium, platinum and palladium in the drag-out tanks.
3. It can used to recovery gold, silver, rhodium, platinum and palladium in the plating rinse waters.
4. It also can used to recovery gold or silver in the strip solutions.
5. It also can used to recovery gold or silver in the Iodine and iodide etching solution.
6. It also can used to recovery gold or silver in the strip solutions.
7. It also can used to recovery silver in the fixer solution.
The main parameters of gold or silver electrolytic recovery machine
| Model | specification | Water treatment Amount | Voltage | Power | |
| Silver | Gold | ||||
| RY200 | 300*450*600mm | 150-200L/day | 100-150L/day | 220V | 300W |
| RY400 | 600*450*600mm | 300-500L/day | 200-350L/day | 220V | 350W |
| RY600 | 900*450*600mm | 500-800L/day | 300-500L/day | 220V | 400W |
| RY800 | 1200*450*600mm | 600-1000L/day | 500-800L/day | 220V | 500W |
RY200 R Y400 RY600 RY800 Features of precious metals electrolytic machine
1. Simple: It is installed at the
2. High recovery rate: gold and silver ≥99%; copper and nickel ≥90%
3. Convenient extraction: Recycled precious metals with high purity can directly cover the anode. Precious metal block can be taken away immediately after separation.
4. Operating costs low: the machine uses a rotating cathode, high frequency pulse intelligent electrolytic method to recover gold or other precious metal. Do not need to consume any consumables and electrolytic accelerator, only need to consume a small amount of electricity. Greatly reduce the operating costs.
5. The content of precious metals in waste liquid after recovery: silver be lower than 5-20ppm, gold be lower than 2-10ppm.
Recovery effect
Q 1
A: Yes, We are factory and we also have our own patent products about the environmental equipment.
Q 2: What's your payment way?
A: Usually available payment method are L/C, T/T,Western Union or PayPal.
Q 3: What's your main products of your company?
A: 1. Professional equipment for jewelry electroforming: electroforming machine for 18K/24k hard gold/silver jewelry and electroforming machine for gold crafts decorations. 2. Hard gold jewelry and crafts decoration production process supporting equipment: gold potassium cyanide making machine,silver oil spray cabinet,De-wax heater,Ultrasonic Cleaning Machine,gold electrolytic recovery machine and cyanide gas treatment tower. 3. Jewelry polishing equipment and concentrated acid purifier: polishing jewelry with heated acid cabinet and a kind of indoor efficient purifier that used to treat concentrated acid mist generated during heating acid and gold melting. 4. Precious metals electroforming/plating machines: electroforming machine for precious metals signs, nameplates and UP and precious metal plating machines. 5. Precious metals recycovery equipment: gold and silver recovery reactor, gold & silver refining reactor, sulfuric acid titanium barrel.
Q4: Does your company provide the whole set equipment for the 3D hard gold/silver jewelry electroforming plant?
A:Yes, Ultimate ONE-STOP SERVICE here
Q 5: W hat's the function of the gold potassium cyanide(GPC) making machine?
A: The GPC is used for producing gold potassium cyanide (GPC), the GPC is the raw material for electroplating and electroforming.
Name: Xiong




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
10 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.