Factory Hot Selling Coffee Machine Parts High Quality Food Grade PTFE/FEP/PFA Tube
Characteristic
High and low temperature preservation
Chemical and Corrosion resistance
High Pressure
Food Grade
Standard length of PTFE/FEP/PFA tube with copper ends(100,120,130, 150, 200, 300, and 400mm) custom lengths available upon request.
Different safety pressure relief valves are available(10bar/12-15bar/15-19/19-24 bar relief)
| Product Name | PPA Connector Coffee Maker Parts |
| Material | PPA |
| Color | White |
| Working Temperature | 200-260℃(PTFE//PFA tube) |
| Density | 2.10-2.20g/cm² |
| Melting Point | 327 |
| Hardness | D55 |
| Tensile Strength | 250 kp/cm² |
| Water Uptake | <0. 01 % |
| Dielectric Coefficient | 2.1 |
Packing:100meter/Wooden Plate /carton/roll
Accept customized packing
Q:who are we? A:, a trusted manufacturer with over 20 years of experience in PTFE, FEP, and PFA tubing.supplying global clients in the North America, South America,Europe,Asia,etc.
Q:who are we?
Q: how can we guarantee quality? A: Always a pre-production sample before mass production; Always final Inspection before shipment; Q:what can you get from us? A: High quality product with factory price:FEP PTFE PFA Tube,Roo,Sheet,Film,Fitting
Q: how can we guarantee quality?
Q:what can you get from us?
Technical support and dedicated after-sales service Q. why should you buy from us not from other suppliers? A: The company's core strengths are as follows
1A real producer,Factory prices help you increase profits.
2 more than 20 years of production experience
3 Experienced staff, strict factory inspection
4 Fast delivery, Stable quality
5 We can customize according to your needs and develop a design requirement plan
Q:How long is your delivery time? A: Generally it is 1-5 days if the goods are in stock size. or it is 7-15 days if the goods are not in stock, it is according to quantity.
Q:What payment and delivery terms can you offer
A: Accepted Delivery Terms: EXW,FOB,CIF,DAP
Payment type:T/T,Paypal,Alipay,Western Union,L/C
Q:Can you provide free samples
A: Some samples of the goods in stock are free but shipping cost is not included




-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Sep 29–Oct 22 (28–51 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.