| CORE DRILLING DEPTH | |
| The depths given below are approximate and refer to vertical drilling. Epiroc cannot guarantee their achievability under all drilling conditions. | |
| B | 2360m |
| N | 1800m |
| H | 1200m |
| P | 680m |
| Power head | |
| Drive type | Hydraulic, stepless speed regulation |
| Spindle (inner diameter) | 90 mm |
| Maximum torque | 7500Nm |
| Maximum speed | 1300 rpm |
| Drilling tower and feed system | |
| Drilling tower travel | 3,6 m |
| Drill rod stroke | 6,09 m |
| Feed force | 170kN |
| lifting force | 330 kN |
| Drilling angle | 45-90º |
| Clamping force Gripper | |
| Main winch | |
| Tension of the rope in straight state | Empty drum - 120kN |
| speed | Empty reel - 40 m/min |
| Rope parameters | 29 m x 21 mm |
| Rope winch | |
| size | 1800m x 6 mm |
| pull force | 1000KG |
| speed | 100-400(RPM) |
| Drilling rig base legs | Four hydraulic jacks with manual adjustment |
| Gross weight | |
| HYDRAULIC SYSTEM | |
| Main pump | 28MPa, 300 L/MIN |
| Auxiliary pump | 20 MPa, 125 L/MIN |
| Pilot pump/servo pump | 21,5 MPa, 54 L/MIN |
| Hydraulic oil cooling system | Air cooling |
| engine | |
| Engine model | |
| displacement | 6.8 L, 6 cylinders |
| power | 160 KW |
| Speed | 2000 RPM |
| Engine type | Diesel, turbocharged |
| Cooling system | Water cooling |
| electrical system | 24 V |
| Mud pump | |
| model | BW-250 |
| flow | 250 L/min |
| Pump pressure | 100 Bar |
| dimension | |
| Working size | mm |
| A | 10026 |
| B | 7227 |
| C | 7412 |
| Shipping dimensions | |
| D | 400 |
| E | 2130 |
| F | 11242 |
| G | 2140 |
| H | 3980 |
| I | 2492 |
Q1:Where is
Q2: Do you have after-sales service? A2:Yes.We provide 18 months free warranty and free technical support for the whole life of any machine. During warranty period, if parts still broken, we can send the new ones freely.
Q3: What about the delivery time? A3:Witnin 7-10days,it is acccording to your order and pls consult us and confirme.
Q4.What's your standard trade terms? A4: We can provide the technical offer with FOB,CFR,CIF,Door to Door and so on. Please kindly tell the detailed port name for competitive ocean freight.
Q5: What is your packaging condition? A5: Usually, we use the standard export wooden box for LCL cargo or FCL in 20/40GP container.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
3 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.