Skip to Content

Browse

Certifications ASME ISO9001

Energy Saving Biogas Fired Power Station Air Preheater Boiler Parts

Available for enquiry 0.0 · 0 reviews
USD

3,100.00 3100.0 USD 3,100.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
BOILER AIR PREHEATER
Material
Carbon Steel, Carbon Steel Alloy Steel Enamel Tube
Machinery test report
Provided
Video outgoing-inspection
Provided
Warranty
1.5 year
Weight (kg)
560
Product description

Usage Precautions

Materialcarbon steel, stainless steel
Material standardASTM,ASME, EN or GB etc.
DimensionCustomization
Applicationspower plants, industrial manufacturers, commercial buildings, maritime industry, and waste-to-energy plants
ProcessRaw materials inspection ➡️Cutting and shaping the materials ➡️ Assembling the components ➡️ Performing welding and surface treatment ➡️Implementing quality control checks ➡️ Painting and final assembly ➡️
Description images
Product detail
Product detail
Product detail
Product detail
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    35 days

  • Step 3

    Packaging and dispatch

    Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 18 fields
Type
BOILER AIR PREHEATER
Material
Carbon Steel, Carbon Steel Alloy Steel Enamel Tube
Machinery test report
Provided
Video outgoing-inspection
Provided
Warranty
1.5 year
Weight (kg)
560
Place of origin
China, Jiangsu
Certification
ASME ISO9001
Surface Treatment
Anti-corrosion Coating
Pressure Level
Low to Medium Pressure
Heat Transfer Efficiency
High Efficiency Design
Corrosion resistance
High Corrosion Resistance
Tube Type
Seamless Tube or Enamel Coated Tube
Customization
Available for Various Boiler Types
Temperature Resistance
High Temperature Resistant
Energy Saving Effect
Enhanced Fuel Utilization
Selling Units
Single item
Model number
Customer's Requirement
Lead time
35 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.