1. Drill pipe elevator specification
CD type Side-opening elevators are mainly used for the clamping and lifting of tubing, casing, drill pipe, and drill collars during oil and gas drilling and workover operations. The products are designed and manufactured in accordance with the requirements of API Spec 8C.
| (Type) | Pipe diameter(in) | (short tons) |
| CD/150 | 2.3/8-14 | 150 |
| CD/200 | 2.3/8-14 | 200 |
| CD/250 | 2.3/8-20 | 250 |
| CD/350 | 4.1/2-20 | 350 |
| CD/500 | 4.1/2-14 | 500 |
| CD/750 | 4.1/2-9.7/8 | 750 |
Feature
| Specification and model | Rated load(KN/US ton) | Suitable DP size | Elevator upper/ lower bore diameter(in) | Net weight (lb) | |
| in | mm | ||||
| CD27/8EU-150 | 1350/150 | 2 7/8EU | 73 | 3.39/2.99 | 160.94 |
| CD3 ½EU-150 | 3 1/2EU | 88.9 | 4.06/3.62 | 167.55 | |
| CD3 ½EU -250 | 2250/250 | 3 1/2EU | 88.9 | 4.06/3.62 | 211.64 |
| CD4 IU-150 | 1350/150 | 4 IU | 101.6 | 4.33/4.13 | 187.39 |
| (CD4EU–150) | 4EU | 101.6 | 4.80/4.65 | 209.44 | |
| CD4 ½IU–150 | 4½1/2IU | 114.3 | |||
| (CD4½IEU–150) | 4½1/2IEU | 114.3 | |||
| (CD4EU –250) | 2250/250 | 4EU | 101.6 | 4.80/4.65 | 275.58 |
| CD4½IU –250 | 4½1/2IU | 114.3 | |||
| (CD4½IEU–250) | 4½1/2IEU | 114.3 | |||
| CD4½EU -150 | 1350/150 | 4½1/2EU | 114.3 | 5.16/4.65 | 202.83 |
| (CD4½EU–250) | 2250/250 | 4½1/2EU | 114.3 | (5.16/4.65)5.31/5.16 | 286.6 |
| CD5 IEU-250 | 5 IEU | 127 | |||
| Note:the model in parentheses is optional. |
DDZ series elevators are center la tch elevator with 18 degree taper shoulder, applied
in handling the drilling pipe and drilling tools, etc. The load ranges from 100 tons to
750 tons. The size rangesare from 2.3/8" to 6.5/8".
| Model | Size(in) | Rated Capacity (short tons) | Remark |
| DDZ -100 | 2.3/8-5 | 100 | MG |
| DDZ -150 | 2.3/8-5.1/2 | 150 | RG |
| DDZ -250 | 2.3/8-5.1/2 | 250 | MGG |
| DDZ -350 | 3.1/2-5.7/8 | 350 | GG |
| DDZ -350TD | 3.1/2-5.7/8 | 350 | For Top Drive |
| DDZ -500 | 3.1/2-6.5/8 | 500 | HGG |
| DDZ -500TD | 3.1/2-6.5/8 | 500 | For Top Drive |
| DDZ -750 | 4-6.5/8 | 750 | For Top Drive |
3.Our certification and
Sincerely in the hope of establishing cooperation relationship with you.
Package: wooden box or according to your request Delivery: 15 days after payment
1.
2. Whether accept customized according to customers' requirements?
Yes, We accept customized, no matter what size and type,and MOQ is 1 piece.
3. About lead time and shipping time?
The lead time depend on quantity of order. Usually it will takes 3-5days shipping to Tianjin Port or Beijing Airport,.If the small order or urgent order we can send you by air after received your agreement. According the distance to your port, usually to European about 25-30 days. To West of American 20-25 days.
4. It is produced according to the standard?
Yes. All our activities are accredited to ISO 9001:2008 and API, both in products and services, at the same time, mature production technology ensuring the quality satisfy international request,we had strictly inspection in the production. Exported to the Middle East, Europe, North America, South America, and other countries and regions.
5. Can I expect a quality product?
Yes. All our activities are accredited to ISO 9001:2008 and API, both in products and services, at the same time, mature production technology ensuring the quality satisfy international request.
6. How do you guarantee your quality?
We select the advanced production technology and equipment, strictly control the whole production process,and we inspected the finished drill bits,we can also make several design changes according to the customer's feedback, and finally ensure the customer's excellent drilling effect.
All sizes and IADC codes of drill bits are available. Special requirements of different models can be customized.
Looking forward to your kind inquiry.......




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Multimodal transport · Approx. shipping fee: $ 358.19 for 1 unit · Estimated delivery in 38-48 business days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.