Nitrogen Purification Equipment
Principle of carbon-added nitrogen purification: The residual oxygen in nitrogen reacts in a deaerator equipped with efficient palladium catalytic fiber to remove oxygen, and then cools and adsorbs to remove water in two stages to obtain high-purity nitrogen. This method is suitable for an environment without hydrogen in the product nitrogen. It has a simple principle, reasonable structure, low energy consumption, and low impurity content.
Principle of hydrogenation purification equipment: Hydrogen is added to nitrogen, and the mixed gas reacts in a deaerator equipped with an efficient catalyst to remove oxygen, and then cools and adsorbs to remove water to obtain high-purity nitrogen. This method is suitable for the application of reducing atmosphere, with adjustable hydrogen content, reasonable structure, and low energy consumption.
Nitrogen purification equipment can achieve a nitrogen purity of 99.9995%.
Model Selection
Production Capacity
Global Aftersales Service Team
The Guarantee/Warranty Period shall be a period of twelve (12) months after on-site startup & commissioning or eighteen (18 ) months after shipment, whichever occurs first.
If any trouble or defect, originating with the design, material, workmanship or operating characteristics of any Goods, arises at any time during GUARANTEE/WARRANTY period, shall, at his own expense and as promptly as possible, make such alterations, repairs and replacements as may be necessary to permit the Goods to function in accordance with the specifications and to fulfill the foregoing guarantees.
Site service
can do paid services of on-site startup, commissioning, installation supervision, training, by providing purchaser with the services of qualified English-speaking engineers at users site, by sending English-speaking engineer to users site.
Our workshop
Packing and Delivery
Exhibitions
Customer Reference





-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.