Casing centralizer is one of the necessary conventional casing accessories, upon well operations completion, the rational use of casing centralizer can play the role of:Reducing lower casing resistance phenomenon, making the casing smoothly down to the design position
| Technical Parameter | ||||||
| Spring Casing Centralizer | Size(In) | OD(mm) | IN(mm) | Height(mm) | Max Start-up Force(N) | Min Reset Force(N) |
| 20" | 680 | 512 | 575 | ≤16725 | ≥8363 | |
| 13-3/8" | 455 | 342 | 560 | ≤10853 | ≥5427 | |
| 9-5/8"*12-1/4" | 335 | 248 | 560 | ≤7117 | ≥7117 | |
| 7" | 235 | 181 | 560 | ≤4626 | ≥4626 | |
| 6-5/8"*8-3/4" | 238 | 171 | 560 | ≤4270 | ≥4270 | |
| 5-1/2”*8-1/2” | 235 | 142 | 560 | ≤2758 | ≥2758 |
| Rigid Centralizer | 13-3/8" | 437 | 344 | 180 |
| 9-5/8"*12-1/4" | 305 | 248 | 120 | |
| 7" | 210 | 182 | 120 | |
| 6-5/8"*8-3/4" | 215 | 171 | 120 | |
| 5-1/2"*8-1/2" | 210 | 142 | 120 |
Bow-spring centralizer 1.These Centralizers are designed for High Restoring Force and Low Starting Force for centralizing the casing pipe in a Vertical,Horizontal and Deviated well 2.Premium quality Bows are made of special alloy steel and hot formed in totally controlled heat treatment plant 3.Spec and performance index of bow spring casing centralizer meet API Spec 10D. The woven centralizer is connected by pin when in use, the unfolded centralizer can be stacked flatly for convenient storage and transportation.
Rigid roller centralizer Rigid casing centralizer is used in deviated wells and horizontal wells. There are several blades on the rigid roller centralizer that can keep casing from contacting the well bore wall
All products purchased in
Q
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 1-5days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance.
Tina Chen
E-maile




-
Step 1
Payment and order readiness
Minimum order: 50 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.