| Product | Diamond steel plate, Diamond steel sheet, Diamond steel coil Checkered steel plate, Checkered steel sheet, Checkered steel coil Chequered steel plate, Chequered steel sheet, Chequered steel coil |
| Standard | BS, EN, GB, AISI, ASTM, DIN, JIS |
| Grade | Q195, Q235, Q355, S235, S275, S355, A36, SS400 etc. |
| Thickness | 1-120mm |
| Width | 0.5-2.5M, according to customers request |
| Length | 1-12M and in coil, according to customers request |
| Sufface Finish | Black, Galvanized, Hot dip galvanized |
| Application | Traffic, Construction, Decoration, Baseplate, Machine, Shipbuilding etc. |
Gangquan were founded on 1998s, which is a large-scale steel manufacturing enterprise production.
♦Over 15 million tons production capacity.
♦ 5 production area in Tianjin, Tangshan, Cangzhou, Handan, Shandong.
♦All products under international certificate ISO, API, BV, BSI, CE, UL.
♦Exports to 170 countries, products are widely used in national and international engineering project.
We welcome new and old customers from all walks of life to
♦Can we visit your factory?
Warmly welcome. Please let us know your schedule and we will pick you up at the airport.
Then we will introduce
♦Can I get a free sample?
Sure. Please let us know the product name, grade and size you request, then we will delivery the sample to you by express.
♦Do you have any stock?
All standard sizes in stock.
♦Can it be customized?
Sure. Please send us the details you request.
♦What is the delivery time?
Standard size can be shipped within 3 days, custom sizes can be shipped around 7-10 working days.
♦What services do you offer?
Our professional sales will contact you within 10 minutes of receiving the inquiry. We will offer the best price and delivery time for you after confirm all details with you. Deliver the goods to the port as quickly as possible.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Sep 29–Oct 22 (28–51 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.