Micro CHP 30kw 40kw 50kw 60kw 80kw 200kw 400 Kw 500 Kw 600kw 1MW Natural Gas Elctricity Generator for Home
Worksite requirements
The worksite needs to meet following basic requirements
a) Ambient temperature between -40℃~ 4 5 ℃
b) Relative humidity less than 9 0 %( 35℃ )
c) Site elevation not higher than 2 0 00m
d) For outdoor installation, simple rain shelter is required.
Fuel gas requirement
1m distance away from genset’s pressure regulating valve of inlet
1)Temperature of natural gas ≤40℃
2)Pressure of natural gas 80 ~ 2 0 0kPa, velocity of pressure≤ 1kPa/min
3)H2S≤2 0 mg/Nm3
4) the ratio of CH4 in natural gas not less than 70%
5) Impurities particle size ≤5μm; impurity content ≤30mg/Nm3
6) Moisture Content of natural gas ≤40g/Nm3
main parameter
| Model Number (Engine Type) | LHNG30-600 |
| Brand Name | |
| Rated Powerr | 30kw 40kw 50kw 60kw 80kw 200kw 400 Kw 500 Kw 600kw |
| Rated Speed | 1000/1200RPM |
| Rated Frequency | 50/60Hz |
| Rated Voltage | 400V/230V |
| Phase | AC 3-Phase, 4 wire |
| Voltage Stability | ≤±2% |
| Voltage transient | ≤±10% |
| Voltage Stable time | ≤1s |
| Heat consumption | ≤11mj/kw.h |
| Lubricant Consumption | ≤1.0g/kw.h |
| Engine Capacity | 71.4L |
| Cylinder Number | 12-V |
| Cylinder Bore | 190mm |
| Stroke | 210mm |
| Starting System | DC 24V electric motor |
| Cooling method | water cooler |
| Lubricant method | Passive and flying lubricant |
| Isolation class | H |
| Protection | IP23 |
| Alternator | Siemens |
| Power Factor | 0.8 lagging |
| Exciting method | brushless |
| Colour | your choice |
| Certificates | ISO 9001:2008, CE |
| Warranty | 1 year or 1000 running hours which arrives first |
| Type | Open |
| Control system | Automatic alarm system |
| Size | 6200x2100x2800mm |
| Weight | 12500kg |
pictures
successful case
1. over 20 years gas/diesel generator produced experience
2. main products include: diesel engines, biomass generator, natural gas generator, biogas generator, coal gas generator set, etc. Products arrange from 5kw-3000kw
3. Our workshop covering more than 40000 square meters, techincal engineer and after-service more than 100 person.
4.CE,ISO9001:2008,ISO2001:1400,SGS etc.certificats approve and passed many patents.
5. we provide TURN-KEY project: like water removal system,H2S removal system,gasified equipment,recovery system of exhaust heat,CCHP system etc.
6.machine have long serive-life: more than 20 years
1.pre-sale service
(1)We will send our engineer to prospect the site of power station free to charge.
(2)According to the situation of site we can supply you many drawings.
2.Sale service
(1)we will send our engineer to the site to guide you the installation of generator set, subsystem and relative equipment.
(2)We will debug the generator set till it can generate power successfully.
(3)We will also supply a technical training to the operators.Or send your staff to
3.After-sale service
( 1)our engineers are in charge of different area,we will response periodically and support you technical service free of charge.
(2)For the quality problem, we will service for you free of charge during the guarantee period.
(3)One year guarantee period and lifetime service.
(4) we solve quality problem in time when genset doesn’t work,We insure to help our clients to gain the biggest economic profit.
4. Spare parts service
(1) Please provide parts No.s W e can supply to you all engine/generator spare parts as your demand
(2) All parts were from original factories or professional factories,complete in specification,keep good quality.
1. delivery time?
according to load power,normal is 30-120days.
2. Do you have CE?
Yes, our generator approve CE,ISO9001,ISO14001,SGS etc.
3. What the Engine brand it is?
Engine brand:.
4. What is the intake gas system?
WOODWARD or German HEINZMANN.
5. What ’ s your generator advantage?
1)Alternator using STANFORD or SIEMENS
2)EGIS Liner
3)Altronic Spark plug
4)ProAct actuators
5)Tecjet control valve and mixer
6)Operation cost is very low about USD167can generating 1kw.h and low maintenance cost
More details please contact me!




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.