| Drilling rig mats Dimension | ||
| Model No. | Dimension | Weight |
| SDGM8*40*6 | 8 ′× 40 ′× 6" | 5500 |
| SDGM8*30*6 | 8 ′× 30 ′× 6" | 4120 |
| SDGM8*25*6 | 8 ′× 25 ′× 6" | 3530 |
| SDGM10*15*6 | 10 ′× 15 ′× 6" | 2420 |
| Remarks:specifications can be customized as requirement |
Application
The rig mats is suitable for ZJ50D, ZJ70 D, ZJ30L40DB and other types of drilling rigs,which is used in different areas such as plains, hills, deserts, plateaus, beaches, swamps and other operations.
Structure
Our drilling rig mat is mainly welded by H-BEAM and composite high quality larch or eucalptus pine wood. The surface is treated with anti-corrosion treatment and calmped by M39 long stud.Of course, the material can be selected based on customer's requirement.
What is rig mats?
A rig mat, also known as a drilling mat, is a large, flat platform that is used to provide a stable surface for oil drilling rigs. These mats are made by composite material of steel and wood.
They come in various sizes and shapes, depending on the requirements of the oil drilling operation.
The rig mat can provide a stable surface, protect the environment and reduce worker fatigue.
Drilling rig mats are packed in rain cloth and fixed with steel frame. The apckage also can be customized as requirement.
Advanced ACD, CAE, CAPP and other computer-aided design software and CNC machining, milling, drilling, boring and other fine processing equipment provide a reliable guarantee for the quality of product manufacturing; The professional technology and production team has 1 senior engineer, 7 engineers, 20 technicians, which provide strongest supporter for product design,innovation and production. Our products has independent intellectual property rights and core technology, reliable quantity and performance, and passed the ISO9001:2008 version of the international quality management system certification.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.