Automatic Stainless Steel Sink Grinding Machine
We have Full Producing Line for Stainlesss Steel Sink
1.Sink Positioning Spot Welding Machine
tomatic Sink Rolling Seam Welding Machine.
tomatic Sink Side Edge Grinding Machine
tomatic Sink Bottom Polishing Machine
5. Automatic Sink Side Wall Polishing Machine
6. Automatic Sink Surface Polishing Machine
About " Welding"
Our Products include Spot Welders,Butt Welders,Flash Butt Welders,Seam Welders,Medium Frequency Inverter DC Welders,Single-phase/Three phase Secondary R ectifie r Spot Welder,Wire Mesh Welding Machines
Sink Producing Line,Automatic Argon Arc Seam Welding Machines,High / Ultrasonic / Medium Frequency Induction Heating Machines,and other automatic equipments.
Qualification Certificate
Package and Delivery
The delivery time for standard machine is about 15-20days.(By Sea,by Air or by Express Way can be choosed)
FAQ
Q1: What does your factory produce?
A: We produce and export all kinds of automatic welding machine and sink producing line.
A: We produce and export all kinds of
We also can design and develop the welding machines according to your requirements.
Q 2: What about your standard delivery date?
A: Usually 40-50 days. O ur company provide just-in-time delivery
A: Usually 40-50
Q3:Do your factory sale directly?
A:YES,it is
Our quality products have been export to many countries,such as,,,,,,,Bazil,,South Asia and Middle East countries.
Q4: Do you have CE Certificate?
A: YES,we have.
Q5: Can you export machines by your factory?
A; YES,we can.
Q 6
A
Q 7: Will you send engineer to help installing the welding machine?
A: Yes, if need, we can send our engineer to go to your factory to help installing our welding machine, train the workers and make sure the welding machine running well before he leave.
A: Yes
Q 8: If the machine get damaged, what can I do?
A: In the gu a rantee time (1 year), we will send the spare parts to you for free. A nd provide the technical consultant for anytime.if more terrible,we can send our engineers to your factory.
A: In the gu
We will provide same good after-sale service as the pre-sale service, any of your question s
we will be replied within 12 hours.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.