Product Application
More than 60 years experience in magnesium industry. - Design capacity of magnesium line: 5,000-25,000 tons per year. - Professional Process Design Engineers, Equipment Engineers, Electrical Engineers. - Leading supplier of magnesium
step1: Calcining
a. Process introduction: Selecting proper dolomite (size from 10-50mm),crushing and screening after it is carried to the factory, then feed the dolomite (>20mm) to the calcination system(including preheater,rotary kiln and cooler), after calcination and cooling, then the calcined dolomite will be conveyed to the hopper. b. Main Equipments: Jaw Crusher, Conveyor, Vibrating screen, Vertical preheater, Rotary kiln, Vertical cooler, etc.
step2:Grinding and balling
a.Process introduction: Using jaw crusher and ferrosilicon crusher to crush and grind ferrosilicon to the size of less than 20mm, then grinding these three kinds of minerals(calcined dolomite,ferrosilicon and fluorite), after grinding, convey them to the briquetter. b.Main equipment: Electronic batching scale, Bucket elevator, Ball mill, Screw conveyer,FU chain conveyor, etc.
step3:Reduction reaction and Refining
a.Process introduction: To refine the raw materials, and produce qualified products. b.Main equipment: Reduction furnace, Refining furnace, Electronic moisture device, Wind machine, Vacuum pump, Electronic moisture device, Jet pump, Continuous casting machine, etc.
Our advantages
| Model (m) | Basic Parameters(t/h) | Reducer | Electric Motor | Qty of Support (No.) | Equipment Weight(t) | |||
| Reloving Speed (r/min) | Slope(%) | Capacity (t/h) | Model | Model | Power(KW) | |||
| φ1.6*32m | 0.58-2.85 | 4 | 2 | ZQ75-50 | YCT250-4A | 18.5 | 3 | 46.8 |
| φ1.6/1.9*36m | 0.53-1.59 | 4 | 2.5-3 | ZQ110-7 | YCTZ50-4B | 22 | 3 | 57 |
| φ1.9*39m | 0.53-1.59 | 4 | 3-3.4 | ZQ125-7 | YCT315-4A | 37 | 3 | 71.79 |
| φ2.2*45m | 0.214-1.64 | 3.5 | 4-5 | Main ZS125-5 | YCT315-4B | 45 | 3 | 142.6 |
| Auxiliary:ZQ40-40 | Y112M-4 | 4 | ||||||
| φ2.5*50m | 0.62-1.5 | 3.5 | 5-6 | Main:ZS165-5 | YCT355-4A | 55 | 3 | 180 |
| Auxiliary:ZS50-1 | Y160M-6 | 7.5 | ||||||
| φ2.5*55m | 0.62-1.5 | 3.5 | 5-6 | Main: ZS165-5 | YCT355-4A | 55 | 3 | 185 |
| Auxiliary:ZS50-1 | Y160M-6 | 7.5 | ||||||
| φ2.8*55m | 0.62-1.5 | 3.5 | 6-7 | Main: ZS165-5 | YCT355-4B | 75 | 3 | 215.6 |
| Auxiliary:ZS50-1 | Y160L-6 | 11 | ||||||
| φ3.0*60m | 0.5-1.5 | 3.5 | 7-9 | Main:ZS165-3 | ZSN-280-11B | 125 | 4 | 310.9 |
| Auxiliary:ZS50-1 | Y160L-6 | 11 | ||||||
| φ3.2*64m | 0.4-1.5 | 3.5 | 8-10 | Main: ZS130-16 | ZSN-280-11B | 190 | 4 | 337.8 |
| Auxiliary:Zl50-1 | Y180L-4 | 22 | ||||||
| φ3.5*70m | 0.4-1.5 | 3.5 | 12-14 | Main: ZSY500-40 | ZSN-315-082 | 280 | 4 | 394.6 |
| Auxiliary:Zl50-14 | Y180L-4 | 22 | ||||||
| φ4.0*80m | 0.4-1.5 | 3.5 | 16-20 | Main: ZLY630-35.5 | ZSN-315-12 | 355 | 4 | 564.8 |
| Auxiliary: ZSY280-35.5 | Y200L-4 | 30 |
Belt conveyors
1. Excellent installation team or installation service for you; 2. Provide you with operating and training services; 3. Help with the equipment commissioning and solve problems in trial operation; 4. Check before acceptance of single equipment or whole
We have got ISO9001:2008 Quality Management System Certification CE Certification (Ball Mill) ISO14001:2004 Environmental Management System Certification OHSAS 18001:2007 Occupational Health&safety Management System Certification




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.