| General introduction |
Advantages: Hydraulic stone & concrete splitter is one of the efficient, safest and easiest ways of mining, dimensional stone quarrying, demolition & removing mass and reinforced concrete.
New model no splitter standard configuration is 3 aluminum cylinder with centre wedge and one counter wedge for each, and plus diesel motor engine, pump station, and high pressure hose etc.
| Model Number | Hole Diameter (mm) | Counter Wedge Dia (mm) | Counter Wedge Length (mm) | Min hole depth (mm) | Actually splitting force (ton) | Weight (kg) | Length Cylinder Body (mm) | Splitting Distance (mm) |
| PD250 | 42-44 | 40 | 250 | 550 | 450 | 34 | 700 | 10-18 |
| PD350 | 44-46 | 42 | 350 | 650 | 450 | 35 | 700 | 10-18 |
| PD450 | 46-48 | 44 | 450 | 750 | 450 | 36 | 700 | 10-18 |
| Images |
| Hydraulic Pump Station ( Eletric Mortor ) |
| Motor Type | Tank capacity ( L) | Power( Kw) | Voltag ( V) | Working Pressur ( Mpa) | Working Flow (L/min) | Working medium | Can configure Cylinder Q'ty pcs | Remarks |
| Electric | 30 | 0.75 | 220 | 60 | 4 | No. 46 or no. 68 anti wear hydraulic oil | 1 | Special production |
| Electric | 30 | 1.5 | 380 | 60 | 4 | 1 | Standard | |
| Electric | 30 | 4 | 380 | 60 | 14 | ‘1-6 | Standard | |
| Electric | 30 | 7.5 | 380 | 60 | 14 | ’1-10 | Import, few use | |
| Diesel | 50 | 5.66KW (7.5P) | 60 | 14 | ‘1-6 | Water/wind cooled |
| Hydraulic Splitting Cylinders |
| spare part |
Counter wedge Centre wedge Piston
Terms & Conditions of Ordering
1.Payment Terms
T/T (Telegraphic Transfer) or Western Union
2. Delivery Term
Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.
3. Transportation
Sample order: we suggest Courier express or by air
Bulk order: we suggest by air or by sea.
4. Quality & Service
A. There will be strict inspection and testing for every order before shipping out.
B Our sales team and Technical Support will response for your question within 24 hours (Holidays Excluded) through
C. Free replacement will provide once the failure confirmed caused or our product quality; Not satisfied with a refund.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.