| Product Name | Nodular Cast Iron Pipe |
| Standard | GB AISI ASTM DIN EN JIS |
| Thickness | 0.5mm-60mm |
| Length | 1m-12 m or as Requirement |
| Surface | Electro-galvanizing, hot-dip galvanizing, or black |
| Outer Diameter | 6mm-1200mm |
| Material | 10MoWVNb, 15MnV, 09Mn2V,20# /45#/ Q195/Q235/Q345/S235/S275/S355/SS400 etc |
| Shape | Round.Square.Rectangle. |
| Technique | Cold Rolled;Hot Rolled |
| Packing | Standard sea-worthy packing |
| Price Term | Ex-work, FOB, CFR, CIF, or as Requirement |
| Exports | African countries,,,, Viet,, etc. |
| Container Size | 20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High),20-25 Metric ton 40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High),20-26 Metric ton 40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High),20-26 Metric ton |
| Payment terms | T/T, L/C, Western Union |
is a diversified enterprise integrating metal products and international trade.We have established a number of joint venture steel production lines with many well-known steel enterprises, with an annual output of 5 million tons.
1.What's your advantage? A: Honest business with competitive price and professional service on export process.
A: Honest business with competitive price and professional service on export process.
n you give warranty of your products? A: Yes, we extend a 100% satisfaction guarantee on all items. Please feel free to feedback immediately if you are not pleased with our quality or service.
A: Yes, we extend a 100% satisfaction guarantee on all items. Please feel free to feedback immediately if you are not pleased with our quality or service.
3.Where are you? Can I visit you? A: Sure,welcome to you visit
A: Sure,welcome to you visit
4.How about the delivery time? A: Within 7-15 days after we confirm you is based on the order quantity and requirement.
A: Within 7-15 days after we confirm you is based on the order quantity and requirement.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.