Skip to Content

Browse

Biomass Gasifier Power Plant for Bagasse, EFB, and Palm Coconut Husk Gasification Power Generation System

Available for enquiry 0.0 · 0 reviews
USD

1,787,520.00 1787520.0 USD 1,787,520.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Electricity Generator Type
Biomass Gasification
Core components
PLC
Machinery test report
Provided
Video outgoing-inspection
Provided
Warranty
1 Year
Type
Plant
Product description

Powermax is a green and clean energy company. Powermax has a long experience in producing and supplying environmentally friendly and high performing gasification systems and gas generator sets. We are specialized in biomass,coal and waste gasifi- cation to energysystems and have acompany history of30years. Powermax have been specialized in biomass gasification power plants since the start of 1986. Our gasification energy systems can convert various types of biomass, waste or coal into: electricity, process steam, drying, industrial heating, district heating and etc.Powermax has its own Development, Design, Construction and Project Manage- ment Departments, We have our own production facilities of in-house gasifiers, gas purification systems and gas generator sets. All our gasification designs benefit from more than100 reference installations worldwide

Description images
Biomass Gasifier Power Plant for Bagasse, EFB, and Palm Coconut Husk Gasification Power Generation System
Biomass Gasifier Power Plant for Bagasse, EFB, and Palm Coconut Husk Gasification Power Generation System
Biomass Gasifier Power Plant for Bagasse, EFB, and Palm Coconut Husk Gasification Power Generation System
Biomass Gasifier Power Plant for Bagasse, EFB, and Palm Coconut Husk Gasification Power Generation System
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    90 days

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 13 fields
Electricity Generator Type
Biomass Gasification
Core components
PLC
Machinery test report
Provided
Video outgoing-inspection
Provided
Warranty
1 Year
Type
Plant
Key selling points
Eco-Friendly
Output Voltage (V)
220
Place of origin
China, Jiangsu
Selling Units
Single item
Single volume
0 cm3
Single gross weight
0.0 kg
Model number
UFBG (Replacing Natural Gas)
Lead time
90 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.