Skip to Content

Browse

Quality Pro Press Electric Plumbing Copper Pipe Tool Hydraulic Hvac Crimping Tools Plastic Box

Available for enquiry 0.0 · 0 reviews
USD

500.00 500.0 USD 500.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Material Application
Copper
Operating Pressure
other, 500 bar(7251.88psi)
Stroke
Other
Crimping type
other
Material
alloy steel
Nominal Capacity
other, 200 L(52.83gal)
Product description

Highlights at a glance

  • Allinone hydraulic crimping tool for copper and plastic pipes in HVAC plumbing.
  • Delivers consistent leakproof connections with minimal manual effort.
  • Durable blowmolded plastic case for secure storage and transport.
  • Ergonomic handle reduces fatigue during extended use on job sites.
  • Compatible with standard press jaws; ideal for professional contractors.
  • Frequently asked questions

    We have three self-owned factories located in Changzhou, Hefei and Yiwu,. Equipped with a sophisticated supply chain system, we are able to deliver efficient one-stop solutions for major clients across the globe.

    Our tool factory was founded in 1997. After nearly 30 years of development, we have built up a complete and mature internal management system.

    We hold a full set of compliance certifications to provide full support for our global partners.

    We have stable and sufficient production capacity, supporting customized OEM services for both small trial orders and large bulk orders.

    Yes, we provide samples for your evaluation. Sample cost can be deducted from your formal bulk order later.

    Normally our production cycle is within 15–25 days after receiving your deposit, guaranteed to be delivered within 30 days for regular orders.
    Description images
    Product detail
    Product detail
    Product detail
    Product detail
    Packaging and fulfilment
    • Step 1

      Payment and order readiness

      Minimum order: 1 Units

      Payment terms, specifications, and order details are confirmed before preparation begins.

    • Step 2

      Preparation

      25 days

    • Step 3

      Packaging and dispatch

      Ocean + Express via FLY Logistics · Approx. shipping fee: $ 34.40 for 1 set · Transit time: Est. 16-23 days

      Final packing, freight, and delivery dates are confirmed before dispatch.

    Technical specifications
    Other details 13 fields
    Material Application
    Copper
    Operating Pressure
    other, 500 bar(7251.88psi)
    Stroke
    Other
    Crimping type
    other
    Material
    alloy steel
    Nominal Capacity
    other, 200 L(52.83gal)
    Voltage
    Other
    Model number (Specification)
    KZ29
    Place of origin
    Zhejiang, China
    Package
    Plastic box
    Selling Units
    Single item
    Single package size
    20X20X20 cm
    Single gross weight
    20.0 kg
    Lead time
    25 days
    Minimum order
    1 Units

    Customer reviews

    0.0 (0)

    No reviews yet

    Be the first customer to review this product.

    Write a review

    Up to 5 JPG, PNG or WebP images; 5 MB each.

    Request custom sourcing

    Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

    Best-match productsCompetitive quotesFast turnaround
    Request custom sourcing

    Upload your requirements

    Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

    XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
    XLSX
    Files are sent securely.