$510-600 / ton
| Product Name | Steel Rebars/ Deformed steel bar |
| Grade | HRB400/HRB500/ASTM A615 GR40/ GR60/ B500B/fe500/B500C, Etc |
| Outer Diameter | 6mm · 50mm |
| Length | uaually 6000mm,9000mm, 12000mm; can be customized |
| Standard | GB:HRB400E HRB500:ASTM A615 GR40,GR60: BS4449 GR460 |
| Inspection Methods | Tensile testing (1) Tensile test method: GB/T228.1-2010, JISZ2201, JI SZ2241, ASTMA370, 1497, BS18, etc; (2) Bending test method: often use standard test methods have GB/T232-88, YB/T5126-2003, JISZ2248, ASTME290, ROCT14019, etc |
| Application | Rebar is widely used in building, bridge, road and other civil engineering construction. From highway, railway,bridge, culvert, tunnel, flood control, dam and other public facilities, to the building foundation, beams,columns, walls, plates, screw steel are indispensable structural materials. With the deepening of 's urbanization,the demand for rebar is strong for infrastructure construction and the booming development of real estate. |
| Quality | Approved by SGS, ISO,CE |
| Payment terms | T/T, L/C at sight |
| Delivery time | 7-15 Days after received payment or irrevocable L/C at sight |
A: We are a professional and famous factory. The main products of
A:Commonly two payment term for new customers
Q: How about the samples? Is it free or extra fees?
A: Usually, we would like to supply the samples before order. If the samples are in stock, it will be free. If the samples need to be produced, we will charge some reasonable cost. But this amount will be deducted from your first order invoice.
Q: How long is your delivery time?
A: Our daily inventory is more than 8000 tons, so common products size orders just need 5 days from stocks. If there are special size order, it will cost 7-15 days.





-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Air + Express via FLY Logistics · Approx. shipping fee: $ 20.00 for 1 ton · Transit time: Est. 8-9 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.